Goto Section: 21.40 | 21.42 | Table of Contents
FCC 21.41
Revised as of
Goto Year:1996 |
1998
Sec. 21.41 Special processing of applications for minor facility
modifications.
(a) Unless an applicant is notified to the contrary by the
Commission, as of the twenty-first day following the date of public
notice, any application that meets the requirements of paragraph (b) of
this section and proposes only the change specified in paragraph (c) of
this section shall be deemed to have been authorized by the Commission.
(b) An application may be considered under the procedures of this
section only if:
(1) It is in the Multipoint Distribution Service;
(2) The cumulative effect of all such applications made within any
60 days period does not exceed the appropriate values prescribed by
paragraph (c) of this section;
(3) The facilities to be modified are not located within 56.3
kilometers (35 miles) of the Canadian or Mexican border;
(4) It is acceptable for filing, is consistent with all of the
Commission's rules, and does not involve a waiver request;
(5) It specifically requests consideration pursuant to this section;
(6) Frequency notification procedures are complied with and a copy
of the application has been served on those who also were served under
Sec. 21.902; and
(7) In the Multipoint Distribution Service, the modified facility
would not produce a power flux density that exceeds -73 dBW/m\2\,
pursuant to Secs. 21.902 and 21.939 at locations on the boundaries of
protected service areas to which there is an unobstructed signal path.
(c) The modifications that may be authorized under the procedures of
this section are:
(1) Changes in a transmitter and existing transmitter operating
characteristics, or protective configuration of transmitter, provided
that:
(i) In the Multipoint Distribution Service, any increase in EIRP is
one and one-half dB or less over the previously-authorized power value;
or
(ii) The necessary bandwidth is not increased by more than 10% of
the previously authorized necessary bandwidth.
(2) Changes in the height of an antenna, provided that:
(i) In Multipoint Distribution Service, any increase in antenna
height is less than 3.0 meters above the previously authorized height;
and
(ii) The overall height of the antenna structure is not increased as
a result of the antenna extending above the height of the previously
authorized structure, except when the new height of the antenna
structure is 6.1 meters or less (above ground or man-made structure, as
appropriate) after the change is made.
(3) Change in the geographical coordinates of a transmit station by
ten seconds or less of latitude, longitude or both, provided that when
notice to the FAA of proposed construction is required by part 17 of
this chapter for antenna structure at the previously authorized
coordinates (or will be required at the new location) the applicant must
comply with the provisions of Sec. 21.15(d).
(d) Upon grant of an application under the procedure of this section
and at such time that construction begins, the applicant must keep a
complete
[[Page 40]]
copy of the application (including the filing date) with the station
license if construction is commenced prior to the receipt of the
authorization.
[ 52 FR 37780 , Oct. 9, 1987, as amended at 55 FR 46009 , Oct. 31, 1990; 58 FR 44894 , Aug. 25, 1993; 60 FR 36552 , July 17, 1995; 61 FR 4364 , Feb. 6,
1996; 61 FR 26674 , May 28, 1996]
Goto Section: 21.40 | 21.42
Goto Year: 1996 |
1998
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public