Goto Section: 22.945 | 22.947 | Table of Contents
FCC 22.946
Revised as of
Goto Year:1996 |
1998
Sec. 22.946 Service commencement and construction periods for cellular
systems.
This section specifies the service commencement and construction
periods and related requirements for cellular systems.
(a) Commencement of service. New cellular systems must be at least
partially constructed and begin providing cellular service to
subscribers within the service commencement periods specified in Table
H-1 of this section. Service commencement periods begin on the date of
grant of the initial authorization, and are not extended by the grant of
subsequent authorizations for the cellular system (such as for major
modifications).
Table H-1.--Commencement of Service
------------------------------------------------------------------------
Required to commence service
Type of cellular system within
------------------------------------------------------------------------
The first system authorized on each 36 months.
channel block in markets 1-90.
The first system authorized on each 18 months.
channel block in all other markets and
any subsequent systems authorized
pursuant to contracts in partitioned
markets.
[[Page 205]]
All other systems........................ 12 months.
------------------------------------------------------------------------
(1) To satisfy the requirement of paragraph (a) of this section, a
cellular system must be interconnected with the public switched
telephone network (PSTN) and must be providing service to mobile
stations operated by its subscribers and roamers. A cellular system is
not considered to be providing service to subscribers if mobile stations
can not make telephone calls to landline telephones and receive
telephone calls from landline telephones through the PSTN, or if the
system intentionally serves only roamer stations.
(2) The licensee must notify the FCC (FCC Form 489) no later than 15
days after the requirements of paragraph (a) of this section are met.
(b) Construction period for specific facilities. The construction
period applicable to specific new or modified cellular facilities for
which an authorization has been granted is one year from the date the
authorization is granted. Failure to comply with this requirement
results in termination of the authorization for the specific new or
modified facility, pursuant to Sec. 22.144(b).
Goto Section: 22.945 | 22.947
Goto Year: 1996 |
1998
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public