Sec. 32.2422 Underground cable.
(a) This account shall include the original cost of underground
cable installed in conduit and of other material used in the
construction of such plant. Subsidiary record categories, as defined
below, are to be maintained for nonmetallic underground cable and
metallic underground cable.
(1) Nonmetallic cable. This subsidiary record category shall include
the original cost of optical fiber cable and other associated material
used in constructing a physical path for the transmission of
telecommunications signals.
(2) Metallic cable. This subsidiary record category shall include
the original cost of single or paired conductor cable, wire and other
associated material used in constructing a physical path for the
transmission of telecommunications signals.
(b) The cost of pumping water out of manholes and of cleaning
manholes and ducts in connection with construction work and the cost of
permits and privileges for the construction of cable and wire facilities
shall be included in the account chargeable with such construction.
(c) The cost of drop and block wires served by underground cable
shall be included in Account 2423, Buried Cable.
(d) The cost of cables leading from the main distributing frame or
equivalent to central office equipment shall be included in the
appropriate switching, transmission or other operations asset account.
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.