Sec. 5.205  Frequencies for field strength surveys or equipment 
          demonstrations.

    (a) Authorizations issued under Sec. 5.202 (e) and (f) will normally 
not have specific frequencies designated in a station license. Prior to 
the commencement of a survey or demonstration, the licensee will request 
a specific frequency assignment and submit the following information:
    (1) Time, date and duration of survey.
    (2) Frequency to be used.
    (3) Location of transmitter and geographical area to be covered.
    (4) Purpose of survey.
    (5) Method and equipment to be used.
    (6) Names and addresses of persons for whom the survey is conducted.
    (b) Upon receipt of authority from the Commission to conduct a 
particular survey, the licensee shall furnish the Engineer-in-Charge of 
the radio district in which the survey is to be conducted, sufficiently 
in advance to assure receipt before commencement thereof, the following 
information: Time, date, duration, frequency, location of transmitter, 
area to be covered, and purpose of survey.


Goto Section: 5.204 | 5.206

Goto Year: 1996 | 1998
CiteFind - See documents on FCC website that cite this rule

Want to support this service?
Thanks!

Report errors in this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public