Sec. 74.651 Equipment changes.
(a) Commission authority, upon appropriate formal application (FCC
Form 313) therefor, is required for any of the following equipment
changes:
(1) Replacement of a specifically authorized transmitter by a
transmitter that is not type accepted or notified for operation under
this subpart pursuant to Sec. 74.655(c).
(2) A change in the frequency of the operating channel or the
transmitter output power.
(3) A change in the location of the TV broadcast auxiliary station
transmitter or transmitting antenna authorized for use at a fixed
location except when the relocation of the transmitter is within the
same building.
(4) Any change in the overall height of the antenna structure,
except where notice to the Federal Aviation Administration is
specifically not required under Sec. 17.14(b) of this chapter.
(5) Any change in the direction of the main radiation lobe of the
transmitting antenna.
(b) Other equipment changes not specifically referred to in
paragraph (a) of this section may be made at the discretion of the
licensee provided that the Federal Communications Commission, Broadcast
Auxiliary Radio Services, 1270 Fairfield Road, Gettysburg, Pennsylvania
17325 is promptly notified in writing upon the completion of such
changes, and that the changes are described in the notification.
(c) Multiplexing equipment may be installed on any licensed TV
broadcast STL, TV relay or translator relay station without authority
from the Commission.
(d) Any application proposing a change in the height of the antenna
or its location must also include the Antenna Structure Registration
Number
[[Page 425]]
(FCC Form 854R) of the antenna structure upon which it will locate its
proposed antenna. In the event the antenna structure does not have a
Registration Number, either the antenna structure owner shall file FCC
Form 854 (``Application for Antenna Structure Registration'') in
accordance with part 17 of this chapter or the applicant shall provide a
detailed explanation why registration and clearance are not necessary.
[ 28 FR 13718 , Dec. 14, 1963, as amended at 38 FR 6827 , Mar. 13, 1973; 47 FR 54448 , Dec. 3, 1982; 47 FR 55938 , Dec. 14, 1982; 49 FR 7131 , Feb. 27,
1984; 58 FR 19776 , Apr. 16, 1993; 61 FR 4368 , Feb. 6, 1996]
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.