Goto Section: 90.723 | 90.727 | Table of Contents
FCC 90.725
Revised as of
Goto Year:1996 |
1998
Sec. 90.725 Construction requirements for Phase I licensees.
(a) Licensees granted commercial nationwide authorizations will be
required to construct base stations having a minimum of five assigned
nationwide channels and place those base stations in operation as
follows:
(1) In at least 10 percent of the geographic areas designated in the
application within two years of initial license grant, including base
stations in at least seven urban areas listed in Sec. 90.741 of this
part;
(2) In at least 40 percent of the geographic areas designated in the
application within four years of initial license grant, including base
stations in at least 28 urban areas listed in Sec. 90.741 of this part;
(3) In at least 70 percent of the geographic areas designated in the
application within six years of initial license grant, including base
stations in at least 28 urban areas listed in Sec. 90.741 of this part;
(4) In all geographic areas designated in the application within ten
years of initial license grant, including base stations in at least 28
urban areas listed in Sec. 90.741 of this part.
(b) Licensees not meeting the two and four year criteria shall lose
the entire authorization, but will be permitted a six month period to
convert the system to non-nationwide channels, if such channels are
available.
(c) Licensees not meeting the six and ten year criteria shall lose
the authorizations for the facilities not constructed, but will retain
exclusivity for constructed facilities.
(d) Each commercial nationwide licensee must file a system progress
report on or before the anniversary date of the grant of its license
after 2, 4, 6 and 10 years, demonstrating compliance with the relevant
construction benchmark criteria.
(1) An overall status report of the system, that must include, but
need not be limited to:
(i) A list of all sites at which base stations have been
constructed, with antenna heights and effective radiated power specified
for each site;
(ii) A list of all other known base station sites at which
construction has not been completed; and
(iii) A construction and operational schedule for the next five-year
period, including any known changes to the plan for construction and
operation submitted with the licensee's original application for the
system.
(2) An analysis of the system's compliance with the requirements of
paragraph (a) of this section, with documentation to support
representations of completed construction, including, but not limited
to:
(i) Equipment purchase orders and contracts;
(ii) Lease or purchase contracts relating to antenna site
arrangements;
(iii) Equipment and antenna identification (serial) numbers; and
(iv) Service agreements and visits.
(e) Beginning with its second license term, each nationwide licensee
must file a progress report once every five years on the anniversary
date of the grant of the first renewal of its authorization, including
the information required by paragraph (d)(1) of this section.
(f) Licensees authorized Phase I non-nationwide systems, or
authorized on Channels 161 through 170 or Channels 181 through 185, must
construct their systems (i.e., have all specified base stations
constructed with all channels) and place their systems in operation, or
commence service in accordance with the provisions of Sec. 90.167,
within twelve months of the initial license grant date. Authorizations
for systems not constructed and placed in operation, or having commenced
service, within twelve months from the date of initial license grant
cancel automatically.
(g) A licensee that loses authorization for some or all of its
channels due to failure to meet construction deadlines or benchmarks may
not reapply for nationwide channels in the same category or for non-
nationwide channels in the same category in the same geographic area for
one year from the date the Commission takes final action affirming that
those channels have been cancelled.
(h) The requirements and conditions of paragraphs (a) through (e)
and paragraph (g) of this section apply to nationwide licensees that
construct and
[[Page 586]]
operate stations for fixed or paging operations on a primary basis
instead of, or in addition to, stations for land mobile operations on a
primary basis except that, in satisfying the base station construction
and placed in operation requirements of paragraph (a) of this section
and the system progress report requirements of paragraphs (d) and (e) of
this section, licensees operating stations for fixed operation on a
primary basis instead of, or in addition to, stations for land mobile or
paging operations on a primary basis in a given geographic area may
demonstrate how such fixed stations are providing substantial service to
the public in those geographic areas.
[ 56 FR 19603 , Apr. 29, 1991, as amended at 56 FR 32517 , July 17, 1991;
57 FR 32450 , July 22, 1992; 58 FR 36363 , July 7, 1993; 62 FR 15996 , Apr.
3, 1997]
Goto Section: 90.723 | 90.727
Goto Year: 1996 |
1998
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public