Goto Section: 101.95 | 101.101 | Table of Contents
FCC 101.97
Revised as of October 1, 2005
Goto Year:2004 |
2006
Sec. 101.97 Future licensing in the 18.30–19.30 GHz band.
(a) All major modifications and extensions to existing FS systems in the
18.3–18.58 band after November 19, 2002, or in the 18.58–19.30 band after
June 8, 2000 (with the exception of certain low power operations authorized
under Sec. 101.147(r)(10)) will be authorized on a secondary basis to FSS
systems. All other modifications will render the modified FS license
secondary to FSS operations, unless the incumbent affirmatively justifies
primary status and the incumbent FS licensee establishes that the
modification would not add to the relocation costs for FSS licensees.
Incumbent FS licensees will maintain primary status for the following
technical changes:
(1) Decreases in power;
(2) Minor changes (increases or decreases) in antenna height;
(3) Minor location changes (up to two seconds);
(4) Any data correction which does not involve a change in the location of
an existing facility;
(5) Reductions in authorized bandwidth;
(6) Minor changes (increases or decreases) in structure height;
(7) Changes (increases or decreases) in ground elevation that do not affect
centerline height;
(8) Minor equipment changes.
(9) Changes in ownership or control.
(b) The provisions of Sec. 101.83 are applicable, notwithstanding any other
provisions of this section.
[ 65 FR 54173 , Sept. 7, 2000, as amended at 66 FR 63516 , Dec. 7, 2001; 68 FR 19698 , Apr. 8, 2003]
Subpart C—Technical Standards
Goto Section: 101.95 | 101.101
Goto Year: 2004 |
2006
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public