Goto Section: 15.305 | 15.309 | Table of Contents

FCC 15.307
Revised as of October 1, 2005
Goto Year:2004 | 2006
Sec.  15.307   Coordination with fixed microwave service.

   (a) UTAM, Inc. is designated to coordinate and manage the transition of the
   1910–1930 MHz band from the Private Operational-Fixed Microwave Service
   (OFS) operating under part 101 of this chapter to unlicensed PCS operations,

   (b) Each application for certification of equipment operating under the
   provisions of this subpart must be accompanied by an affidavit from UTAM,
   Inc. certifying that the applicant is a participating member of UTAM, Inc.
   In the event a grantee fails to fulfill the obligations attendant to
   participation in UTAM, Inc., the Commission may invoke administrative
   sanctions as necessary to preclude continued marketing and installation of
   devices covered by the grant of certification, including but not limited to
   revoking certification.

   (c) An application for certification of a PCS device that is deemed by UTAM,
   Inc. to be noncoordinatable will not be accepted until the Commission
   announces that a need for coordination no longer exists.

   (d) A coordinatable PCS device is required to incorporate means that ensure
   that it cannot be activated until its location has been coordinated by UTAM,
   Inc. The application for certification shall contain an explanation of all
   measures taken to prevent unauthorized operation. This explanation shall
   include all procedural safeguards, such as the mandatory use of licensed
   technicians to install the equipment, and a complete description of all
   technical features controlling activation of the device.

   (e) A coordinatable PCS device shall incorporate an automatic mechanism for
   disabling operation in the event it is moved outside the geographic area
   where its operation has been coordinated by UTAM, Inc. The application for
   certification shall contain a full description of the safeguards against
   unauthorized relocation and must satisfy the Commission that the safeguards
   cannot be easily defeated.

   (f) At such time as the Commission deems that the need for coordination
   between unlicensed PCS operations and existing Part 101 Private
   Operational-Fixed Microwave Services ceases to exist, the disabling
   mechanism required by paragraph (e) of this section will no longer be
   required.

   (g) Operations under the provisions of this subpart are required to protect
   systems in the Private Operational-Fixed Microwave Service operating within
   the 1850–1990 MHz band until the dates and conditions specified in  Sec.  Sec. 101.69
   through 101.73 of this chapter for termination of primary status.
   Interference protection is not required for part 101 stations in this band
   licensed on a secondary basis.

   (h) The operator of a PCS device that is relocated from the coordinated area
   specified by UTAM, Inc., must cease operating the device until coordination
   for the new location is verified by UTAM, Inc.

   [ 58 FR 59180 , Nov. 8, 1993, as amended at  59 FR 32852 , June 24, 1994;  60 FR 27425 , May 24, 1995;  61 FR 29689 , June 12, 1996]


Goto Section: 15.305 | 15.309

Goto Year: 2004 | 2006
CiteFind - See documents on FCC website that cite this rule

Want to support this service?
Thanks!

Report errors in this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public