Sec. 15.525 Coordination requirements.
(a) UWB imaging systems require coordination through the FCC before the
equipment may be used. The operator shall comply with any constraints on
equipment usage resulting from this coordination.
(b) The users of UWB imaging devices shall supply operational areas to the
FCC Office of Engineering and Technology, which shall coordinate this
information with the Federal Government through the National
Telecommunications and Information Administration. The information provided
by the UWB operator shall include the name, address and other pertinent
contact information of the user, the desired geographical area(s) of
operation, and the FCC ID number and other nomenclature of the UWB device.
If the imaging device is intended to be used for mobile applications, the
geographical area(s) of operation may be the state(s) or county(ies) in
which the equipment will be operated. The operator of an imaging system used
for fixed operation shall supply a specific geographical location or the
address at which the equipment will be operated. This material shall be
submitted to Frequency Coordination Branch, OET, Federal Communications
Commission, 445 12th Street, SW, Washington, D.C. 20554, Attn: UWB
Coordination.
(c) The manufacturers, or their authorized sales agents, must inform
purchasers and users of their systems of the requirement to undertake
detailed coordination of operational areas with the FCC prior to the
equipment being operated.
(d) Users of authorized, coordinated UWB systems may transfer them to other
qualified users and to different locations upon coordination of change of
ownership or location to the FCC and coordination with existing authorized
operations.
(e) The FCC/NTIA coordination report shall identify those geographical areas
within which the operation of an imaging system requires additional
coordination or within which the operation of an imaging system is
prohibited. If additional coordination is required for operation within
specific geographical areas, a local coordination contact will be provided.
Except for operation within these designated areas, once the information
requested on the UWB imaging system is submitted to the FCC no additional
coordination with the FCC is required provided the reported areas of
operation do not change. If the area of operation changes, updated
information shall be submitted to the FCC following the procedure in
paragraph (b) of this section.
(f) The coordination of routine UWB operations shall not take longer than 15
business days from the receipt of the coordination request by NTIA. Special
temporary operations may be handled with an expedited turn-around time when
circumstances warrant. The operation of UWB systems in emergency situations
involving the safety of life or property may occur without coordination
provided a notification procedure, similar to that contained in Sec. 2.405(a)
through (e) of this chapter, is followed by the UWB equipment user.
[ 67 FR 34856 , May 16, 2002, as amended at 68 FR 19751 , Apr. 22, 2003]
Effective Date Note: At 68 FR 19751 , Apr. 22, 2003, Sec. 15.525 was amended by
revising paragraphs (b) and (e). This amendment contains information
collection and recordkeeping requirements and will not become effective
until approval has been given by the Office of Management and Budget.
Subpart G—Access Broadband Over Power Line (Access BPL)
Source: 70 FR 1374 , Jan. 7, 2005, unless otherwise noted.
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.