Goto Section: 25.271 | 25.273 | Table of Contents

FCC 25.272
Revised as of October 1, 2005
Goto Year:2004 | 2006
Sec.  25.272   General inter-system coordination procedures.

   (a) Each space station licensee in the Fixed-Satellite Service shall
   establish a satellite network control center which will have the
   responsibility to monitor space-to-Earth transmissions in its system. This
   would indirectly monitor uplink earth station transmissions in its system
   and to coordinate transmissions in its satellite system with those of other
   systems to prevent harmful interference incidents or, in the event of a
   harmful interference incident, to identify the source of the interference
   and correct the problem promptly.

   (b) Each space station licensee shall maintain on file with the Commission
   and with its Columbia Operations Center in Columbia, Maryland, a current
   listing of the names, titles, addresses and telephone numbers of the points
   of contact for resolution of interference problems. Contact personnel should
   include those responsible for resolution of short term, immediate
   interference problems at the system control center, and those responsible
   for long term engineering and technical design issues.

   (c) The transmitting earth station licensee shall provide the operator(s) of
   the satellites, on which the licensee is authorized to transmit, contact
   telephone numbers for the control center of the earth station and emergency
   telephone numbers for key personnel; a current file of these contacts shall
   be maintained at each satellite system control center.

   (d) An earth station licensee shall ensure that each of its authorized earth
   stations complies with the following:

   (1) The earth station licensee shall ensure that there is continuously
   available means of communications between the satellite network control
   center and the earth station operator or its remote control point as
   designated by the licensee.

   (2) The earth station operator shall notify the satellite network control
   center and receive permission from the control center before transmitting to
   the satellite or changing the basic characteristics of a transmission.

   (3) The earth station operator shall keep the space station licensee
   informed of all actual and planned usage.

   (4) Upon approval of the satellite network control center, the earth station
   operator may radiate an RF carrier into the designated transponder. Should
   improper illumination of the transponder or undue adjacent transponder
   interference be observed by the satellite network control center, the earth
   station operator shall immediately take whatever measures are needed to
   eliminate the problem.

   (5) The space station licensee may delegate the responsibility and duties of
   the satellite network control center to a technically qualified user or
   group of users, but the space station licensee shall remain ultimately
   responsible for the performance of those duties.

   [ 58 FR 13421 , Mar. 11, 1993, as amended at  62 FR 5931 , Feb. 10, 1997]


Goto Section: 25.271 | 25.273

Goto Year: 2004 | 2006
CiteFind - See documents on FCC website that cite this rule

Want to support this service?
Thanks!

Report errors in this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public