FCC 73.761 Revised as of October 1, 2006
Goto Year:2005 |
2007
Sec. 73.761 Modification of transmission systems.
Specific authority, upon filing formal application (FCC Form 309) therefor,
is required for any of the following changes:
(a) Change involving an increase or decrease in the power rating of the
transmitters.
(b) A replacement of the transmitters as a whole.
(c) Change in the location of the transmitting antenna.
(d) Change in location of main studio, if it is proposed to move the main
studio to a different city from that specified in the license.
(e) Change in the power delivered to the antenna.
(f) Change in frequency control and/or modulation system.
(g) Change in direction or gain of antenna system.
Other changes, not specified above in this section, may be made at any time
without the authority of the Commission: Provided, That the Commission shall
be immediately notified thereof and such changes shall be shown in the next
application for renewal of license.
(Secs. 4, 5, 303, 48 Stat., as amended, 1066, 1068, 1082 (47 U.S.C. 154,
155, 303))
[ 38 FR 18895 , July 16, 1973, as amended at 44 FR 65765 , Nov. 15, 1979.
Redesignated at 70 FR 46677 , Aug. 10, 2005]
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.