FCC 74.1251 Revised as of October 1, 2006
Goto Year:2005 |
2007
Sec. 74.1251 Technical and equipment modifications.
(a) No change, either mechanical or electrical, except as provided in part 2
of this chapter, may be made in FM translator or booster apparatus which has
been certificated by the Commission without prior authority of the
Commission.
(b) Formal application on FCC Form 349 is required of all permittees and
licensees for any of the following changes:
(1) Replacement of the transmitter as a whole, except replacement with a
transmitter of identical power rating which has been certificated by the FCC
for use by FM translator or FM booster stations, or any change which could
result in the electrical characteristics or performance of the station. Upon
the installation or modification of the transmitting equipment for which
prior FCC authority is not required under the provisions of this paragraph,
the licensee shall place in the station records a certification that the new
installation complies in all respects with the technical requirements of
this part and the terms of the station authorization.
(2) A change in the transmitting antenna system, including the direction of
radiation or directive antenna pattern.
(3) Any change in the overall height of the antenna structure except where
notice to the Federal Aviation Administration is specifically not required
under Sec. 17.14(b) of this chapter.
(4) Any change in the location of the translator or booster except a move
within the same building or upon the same pole or tower.
(5) Any horizontal change in the location of the antenna structure which
would (i) be in excess of 152.4 meters (500 feet), or (ii) would require
notice to the Federal Aviation Administration pursuant to Sec. 17.7 of the FCC's
rules.
(6) Any change in the output frequency of a translator.
(7) Any increase of authorized effective radiated power. FM translator and
booster stations may decrease ERP on a modification of license application
provided that exhibits are included to demonstrate that the following
requirements are met:
(i) The license application may not propose to eliminate the authorized
horizontally polarized ERP, if a horizontally polarized ERP is currently
authorized;
(ii) The installed height of the antenna radiation center is not increased
by more than two meters nor decreased by more than four meters from the
authorized height for the antenna radiation center; and
(iii) The station is not presently authorized with separate horizontal and
vertical antennas mounted at different heights. Use of separate horizontal
and vertical antennas requires a construction permit before implementation
or changes.
(8) Any change in area being served.
(c) Changes in the primary FM station being retransmitted must be submitted
to the FCC in writing.
(d) Any application proposing a change in the height of the antenna
structure or its location must also include the Antenna Structure
Registration Number (FCC Form 854R) of the antenna structure upon which it
proposes to locate its antenna. In the event the antenna structure does not
have a Registration Number, either the antenna structure owner shall file
FCC Form 854 (“Application for Antenna Structure Registration”) in
accordance with part 17 of this chapter or the applicant shall provide a
detailed explanation why registration and clearance are not required.
[ 35 FR 15388 , Oct. 2, 1970, as amended at 45 FR 26068 , Apr. 17, 1980; 47 FR 24580 , June 7, 1982; 50 FR 3525 , Jan. 25, 1985; 50 FR 23710 , June 5, 1985;
55 FR 50698 , Dec. 10, 1990; 61 FR 4368 , Feb. 6, 1996; 63 FR 33879 , June 22,
1998; 63 FR 36606 , July 7, 1998; 65 FR 79780 , Dec. 20, 2000]
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.