Goto Section: 73.760 | 73.762 | Table of Contents

FCC 73.761
Revised as of October 1, 2008
Goto Year:2007 | 2009
  Sec.  73.761   Modification of transmission systems.

   Specific authority, upon filing formal application (FCC Form 309) therefor,
   is required for any of the following changes:

   (a) Change involving an increase or decrease in the power rating of the
   transmitters.

   (b) A replacement of the transmitters as a whole.

   (c) Change in the location of the transmitting antenna.

   (d) Change in location of main studio, if it is proposed to move the main
   studio to a different city from that specified in the license.

   (e) Change in the power delivered to the antenna.

   (f) Change in frequency control and/or modulation system.

   (g) Change in direction or gain of antenna system.

   Other changes, not specified above in this section, may be made at any time
   without the authority of the Commission: Provided, That the Commission shall
   be immediately notified thereof and such changes shall be shown in the next
   application for renewal of license.

   (Secs. 4, 5, 303, 48 Stat., as amended, 1066, 1068, 1082 (47 U.S.C. 154,
   155, 303))

   [ 38 FR 18895 , July 16, 1973, as amended at  44 FR 65765 , Nov. 15, 1979.
   Redesignated at  70 FR 46677 , Aug. 10, 2005]


Goto Section: 73.760 | 73.762

Goto Year: 2007 | 2009
CiteFind - See documents on FCC website that cite this rule

Want to support this service?
Thanks!

Report errors in this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public