Goto Section: 15.305 | 15.309 | Table of Contents

FCC 15.307
Revised as of October 1, 2009
Goto Year:2008 | 2010
  §  15.307   Coordination with fixed microwave service.

   (a) UTAM, Inc. is designated to coordinate and manage the transition of
   the 1910–1930 MHz band from the Private Operational-Fixed Microwave
   Service (OFS) operating under part 101 of this chapter to unlicensed
   PCS operations,

   (b) Each application for certification of equipment operating under the
   provisions of this subpart must be accompanied by an affidavit from
   UTAM, Inc. certifying that the applicant is a participating member of
   UTAM, Inc. In the event a grantee fails to fulfill the obligations
   attendant to participation in UTAM, Inc., the Commission may invoke
   administrative sanctions as necessary to preclude continued marketing
   and installation of devices covered by the grant of certification,
   including but not limited to revoking certification.

   (c) An application for certification of a PCS device that is deemed by
   UTAM, Inc. to be noncoordinatable will not be accepted until the
   Commission announces that a need for coordination no longer exists.

   (d) A coordinatable PCS device is required to incorporate means that
   ensure that it cannot be activated until its location has been
   coordinated by UTAM, Inc. The application for certification shall
   contain an explanation of all measures taken to prevent unauthorized
   operation. This explanation shall include all procedural safeguards,
   such as the mandatory use of licensed technicians to install the
   equipment, and a complete description of all technical features
   controlling activation of the device.

   (e) A coordinatable PCS device shall incorporate an automatic mechanism
   for disabling operation in the event it is moved outside the geographic
   area where its operation has been coordinated by UTAM, Inc. The
   application for certification shall contain a full description of the
   safeguards against unauthorized relocation and must satisfy the
   Commission that the safeguards cannot be easily defeated.

   (f) At such time as the Commission deems that the need for coordination
   between unlicensed PCS operations and existing Part 101 Private
   Operational-Fixed Microwave Services ceases to exist, the disabling
   mechanism required by paragraph (e) of this section will no longer be
   required.

   (g) Operations under the provisions of this subpart are required to
   protect systems in the Private Operational-Fixed Microwave Service
   operating within the 1850–1990 MHz band until the dates and conditions
   specified in § § 101.69 through 101.73 of this chapter for termination of
   primary status. Interference protection is not required for part 101
   stations in this band licensed on a secondary basis.

   (h) The operator of a PCS device that is relocated from the coordinated
   area specified by UTAM, Inc., must cease operating the device until
   coordination for the new location is verified by UTAM, Inc.

   [ 58 FR 59180 , Nov. 8, 1993, as amended at  59 FR 32852 , June 24, 1994;
    60 FR 27425 , May 24, 1995;  61 FR 29689 , June 12, 1996]


Goto Section: 15.305 | 15.309

Goto Year: 2008 | 2010
CiteFind - See documents on FCC website that cite this rule

Want to support this service?
Thanks!

Report errors in this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public