Goto Section: 95.859 | 95.1001 | Table of Contents

FCC 95.861
Revised as of October 2, 2015
Goto Year:2014 | 2016
  § 95.861   Interference.

   (a) When a 218-219 MHz Service system suffers harmful interference within
   its service area or causes harmful interference to another 218-219 MHz
   Service system, the licensees of both systems must cooperate and resolve the
   problem by mutually satisfactory arrangements. If the licensees are unable
   to do so, the Commission may impose restrictions including, but not limited
   to, specifying the transmitter power, antenna height or area, duty cycle, or
   hours of operation for the stations concerned.

   (b)  The  use of any frequency segment (or portion thereof) at a given
   geographical location may be denied when, in the judgment of the Commission,
   its  use  in that location is not in the public interest; the use of a
   frequency segment (or portion thereof) specified for the 218-219 MHz Service
   system may be restricted as to specified geographical areas, maximum power,
   or other operating conditions.

   (c) A 218-219 MHz Service licensee must provide a copy of the plan required
   by § 95.815 (a) of this part to every TV Channel 13 station whose Grade B
   predicted contour overlaps the licensed service area for the 218-219 MHz
   Service system. The 218-219 MHz Service licensee must send the plan to the
   TV Channel 13 licensee(s) within 10 days from the date the 218-219 MHz
   Service submits the plan to the Commission, and the 218-219 MHz Service
   licensee must send updates to this plan to the TV Channel 13 licensee(s)
   within 10 days from the date that such updates are filed with the Commission
   pursuant to § 95.815.

   (d) Each 218-219 MHz Service system licensee must provide upon request, and
   install free of charge, an interference reduction device to any household
   within a TV Channel 13 station Grade B predicted contour that experiences
   interference due to a component CTS or RTU.

   (e) Each 218-219 MHz Service system licensee must investigate and eliminate
   harmful interference to television broadcasting and reception, from its
   component  CTSs and RTSs, within 30 days of the time it is notified in
   writing, by either an affected television station, an affected viewer, or
   the Commission, of an interference complaint. Should the licensee fail to
   eliminate the interference within the 30-day period, the CTS(s) or RTU(s)
   causing the problem(s) must discontinue operation.

   (f)  The boundary of the 218-219 MHz Service system, as defined in its
   authorization, is the limit of interference protection for that 218-219 MHz
   Service system.

   [ 64 FR 59663 , Nov. 3, 1999, as amended at  66 FR 9219 , Feb. 7, 2001]

   return arrow Back to Top

Subpart G—Low Power Radio Service (LPRS)

   Source:  61 FR 46569 , Sept. 4, 1996, unless otherwise noted.

   return arrow Back to Top

General Provisions

   return arrow Back to Top


Goto Section: 95.859 | 95.1001

Goto Year: 2014 | 2016
CiteFind - See documents on FCC website that cite this rule

Want to support this service?
Thanks!

Report errors in this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public