Goto Section: 15.123 | 15.202 | Table of Contents
FCC 15.201
Revised as of October 1, 2018
Goto Year:2017 |
2019
§ 15.201 Equipment authorization requirement.
(a) Intentional radiators operated as carrier current systems, devices
operated under the provisions of § § 15.211, 15.213, and 15.221, and
devices operating below 490 kHz in which all emissions are at least 40
dB below the limits in § 15.209 are subject to Suppliers Declaration of
Conformity pursuant to the procedures in subpart J of part 2 of this
chapter prior to marketing.
(b) Except as otherwise exempted in paragraph (c) of this section and
in § 15.23, all intentional radiators operating under the provisions of
this part shall be certified by the Telecommunication Certification
Bodies pursuant to the procedures in subpart J of part 2 of this
chapter prior to marketing.
(c) For devices such as perimeter protection systems which, in
accordance with § 15.31(d), are required to be measured at the
installation site, each application for certification must be
accompanied by a statement indicating that the system has been tested
at three installations and found to comply at each installation. Until
such time as certification is granted, a given installation of a system
that was measured for the submission for certification will be
considered to be in compliance with the provisions of this chapter,
including the marketing regulations in subpart I of part 2 of this
chapter, if tests at that installation show the system to be in
compliance with the relevant technical requirements. Similarly, where
measurements must be performed on site for equipment subject to
Supplier's Declaration of Conformity, a given installation that has
been found compliant with the applicable standards will be considered
to be in compliance with the provisions of this chapter, including the
marketing regulations in subpart I of part 2 of this chapter.
(d) For perimeter protection systems operating in the frequency bands
allocated to television broadcast stations operating under part 73 of
this chapter, the holder of the grant of certification must test each
installation prior to initiation of normal operation to verify
compliance with the technical standards and must maintain a list of all
installations and records of measurements. For perimeter protection
systems operating outside of the frequency bands allocated to
television broadcast stations, upon receipt of a grant of
certification, further testing of the same or similar type of system or
installation is not required.
[ 54 FR 17714 , Apr. 25, 1989, as amended at 68 FR 68546 , Dec. 9, 2003;
82 FR 50834 , Nov. 2, 2017]
return arrow Back to Top
Goto Section: 15.123 | 15.202
Goto Year: 2017 |
2019
CiteFind - See documents on FCC website that
cite this rule
Want to support this service?
Thanks!
Report errors in
this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please
help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public