FCC Web Documents citing 2.405
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-05-2395A1.doc http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-05-2395A1.pdf http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-05-2395A1.txt
- and is subject to ratification or modification by us. All requests for emergency operation must be coordinated with local frequency coordinators. Interference protection to state and local emergency and public safety services must be maintained. All licensees must be aware that land mobile and Amateur licensees may have unusual modes of operation for the provision for emergency communications under Sections 2.405 and 97.401 of the Rules and these should be protected. MVPD Technical Compliance: The following technical requirements are waived for ninety days from the release of this notice: Sections 76.601 [Performance Tests]; 76.605 [Technical Standards], but not 76.605(a)(12) [leakage limits]; and 76.614 [System Monitoring]. Media Bureau Engineering Division staff will provide a point of contact and expedited service and coordination,
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-05-2774A1.doc http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-05-2774A1.pdf http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-05-2774A1.txt
- and is subject to ratification or modification by us. All requests for emergency operation must be coordinated with local frequency coordinators. Interference protection to state and local emergency and public safety services must be maintained. All licensees must be aware that land mobile and Amateur licensees may have unusual modes of operation for the provision for emergency communications under Sections 2.405 and 97.401 of the Rules and these should be protected. MVPD Technical Compliance: The following technical requirements are waived for ninety days from the release of this notice: Sections 76.601 [Performance Tests]; 76.605 [Technical Standards], but not 76.605(a)(12) [leakage limits]; and 76.614 [System Monitoring]. Media Bureau Engineering Division staff will provide a point of contact and expedited service and coordination,
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/DOC-261254A1.doc http://hraunfoss.fcc.gov/edocs_public/attachmatch/DOC-261254A1.pdf http://hraunfoss.fcc.gov/edocs_public/attachmatch/DOC-261254A1.txt
- and is subject to ratification or modification by us. All requests for emergency operation must be coordinated with local frequency coordinators. Interference protection to state and local emergency and public safety services must be maintained. All licensees must be aware that land mobile and Amateur licensees may have unusual modes of operation for the provision for emergency communications under Sections 2.405 and 97.401 of the Rules and these should be protected. MVPD Technical Compliance: The following technical requirements are waived for ninety days from the release of this notice: Sections 76.601 [Performance Tests]; 76.605 [Technical Standards], but not 76.605(a)(12) [leakage limits]; and 76.614 [System Monitoring]. Media Bureau Engineering Division staff will provide a point of contact and expedited service and coordination,
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-02-48A1.doc http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-02-48A1.pdf http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-02-48A1.txt
- users as NTIA must complete its coordination efforts within 15 business days of its receipt of the request for routine UWB operations. Special temporary operations may be handled with a much faster turn-around time when circumstances warrant. Further, the operation of UWB systems in emergency situations can be commenced immediately pursuant to the notification procedures specified in 47 C.F.R. Section 2.405(a)-(e). We believe that these technical requirements and operational restrictions will ensure that imaging systems do not cause harmful interference. We agree with Bosch, TDC and Zircon that there is no need for a wall contact switch or automatic power control for imaging devices. However, as with GPRs, we are requiring that wall imaging systems be equipped with a manually operated
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-03-33A1.doc http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-03-33A1.pdf http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-03-33A1.txt
- medical imaging systems. The -10 dB bandwidth is the frequency band bounded by the points that are 10 dB below the highest level radiated emission, as based on the complete transmission system including the antenna. This bandwidth is defined in the rules as the UWB bandwidth. See 47 C.F.R. § 15.503(a). The notification procedure is described in 47 C.F.R. § 2.405(a)-(e). As used in this MO&O, law enforcement, fire and emergency rescue organizations refers to parties eligible to obtain a license from the FCC under the eligibility requirements specified in 47 C.F. R. § 90.20(a)(1). As detailed later in this MO&O, the provisions regarding who may operate a GPR and for what purpose were further interpreted in an Order adopted on