FCC Web Documents citing 51.327
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-06-1863A1.doc http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-06-1863A1.pdf http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-06-1863A1.txt
- and conditions for the provision of unbundled network elements. 51.315 Combination of unbundled network elements. 51.317 Standards for requiring the unbundling of network elements. 51.319 Specific unbundling requirements. 51.321 Methods of obtaining interconnection and access to unbundled elements under section 251 of the Act. 51.323 Standards for physical collocation and virtual collocation. 51.325 Notice of network changes: Public notice requirement. 51.327 Notice of network changes: Content of notice. 51.329 Notice of network changes: Methods for providing notice. 51.331 Notice of network changes: Timing of notice. 51.333 Notice of Network Changes: Short term notice, objections thereto and objections to retirement of copper loops or copper subloops. 51.335 Notice of network changes: Confidential or proprietary information. SUBPART -- E -- EXEMPTIONS, SUSPENSIONS, AND
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-01-98A1.doc http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-01-98A1.pdf http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-01-98A1.txt
- CIX Comments at 2-3; ISPC Comments at 5-7. Computer III March 1999 Order, 14 FCC Rcd at 4321, para. 49. See id. at 4317-18, para. 43 (citing Implementation of the Local Competition Provisions of the Telecommunications Act of 1996, CC Docket No. 96-98, Second Report and Order and Memorandum Opinion and Order, 11 FCC Rcd 19392 (1996)); 47 C.F.R. § 51.327. The RFA, see 5 U.S.C. § 601 et. seq., has been amended by the Contract With America Advancement Act of 1996, Pub. L. No. 104-121, 110 Stat. 847 (1996) (CWAAA). Title II of the CWAAA is the Small Business Regulatory Fairness Act of 1996 (SBREFA). 5 U.S.C. § 605(b). 5 U.S.C. § 601(6). 5 U.S.C. § 601(3) (incorporating by reference
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-03-36A1.doc http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-03-36A1.pdf
- to maintain two networks would impose additional costs). 47 U.S.C. § 251(c)(5); 47 C.F.R. §§ 51.325-.335. This disclosure requirement applies to the retirement of both feeder plant and distribution plant. See, e.g., Sprint Comments at 45 (arguing that a competitive LEC could be stranded after an incumbent LEC upgrades its loop plant); Supra Comments at 10-13. See 47 C.F.R. § 51.327. Corning Feb. 6, 2003 Ex Parte Letter at 7 (proposing a 90-day application process before the Commission with respect to the retirement of any copper loops); Letter from Derek R. Khlopin, HTBC, to Marlene H. Dortch, Secretary, FCC, CC Docket Nos. 01-338, 96-98, 98-147 at 3 (filed Jan. 23, 2003) (HTBC Jan. 23, 2003 Ex Parte Letter) (stating that HTBC's