FCC Web Documents citing 90.757
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-00-109A1.doc http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-00-109A1.pdf http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-00-109A1.txt
- 89-552, Implementation of Sections 3(n) and 332 of the Communications Act, Regulatory Treatment of Mobile Services, GN Docket No. 93-252, Implementation of Section 309(j) of the Communications Act - Competitive Bidding, 220-222 MHz, PP Docket No. 93-253, Second Memorandum Opinion and Order and Third Notice of Proposed Rulemaking, 11 FCC Rcd. 188, 284-85, 197-198 (1995). See 47 C.F.R. 90.757(b). Id. Id. $ PNG > !R>^SS߿"Kker4 JdMOO ,I TV5 0z̪ %o a% Tf(c) U~UyӚo=c {YAD Zv}YAD e/,-%E9 ^1J 2 bʆPh=f 8H]}`2@ 'XtpO $> -m``Q(q P e D _ p/]b|?O VJõ tXTe 2)V`` (c)}ltmE...bϡ gs>o(R)"qQ ܆D N - >rKp-~ifM z} tm(c)cv ` 0i 0i 0i 0i 0i 0i 0i 0i 0i 0i 0i 0i
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-06-1863A1.doc http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-06-1863A1.pdf http://hraunfoss.fcc.gov/edocs_public/attachmatch/DA-06-1863A1.txt
- modification of 220-222 MHz stations. Need: These rules are needed to provide 220-222 MHz licensees with flexibility to modify their authorized facilities, and to provide a safeguard against the warehousing of 220-222 MHz spectrum. Legal Basis: 47 U.S.C. 154(i), 161, 303(g), 303(r), 332(c)(7). Section Number and Title: 90.751 Minor modifications of Phase I, non-nationwide licenses. 90.753 Conditions of license modification. 90.757 Construction requirements. SUBPART V - COMPETITIVE BIDDING PROCEDURES FOR 800 MHz SPECIALIZED MOBILE RADIO SERVICE Brief Description: The part 90 rules state the conditions under which radio communications systems may be licensed and used in the Public Safety, Industrial/Business Radio Pool, and Radiolocation Radio Services. Subpart V sets forth the rules governing the use of competitive bidding to choose among
- http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-00-235A1.doc http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-00-235A1.pdf http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-00-235A1.txt
- Blooston Mordkofsky Comments at 2; and UTC Comments at 3. See also PCIA Comments at 4-5. APCO Comments at 2. API Comments at 4. API Reply Comments at 4. 47 C.F.R. 90.135. For example, Location and Monitoring Service stations (47 C.F.R. 90.353), 800 MHz trunked radio systems (47 C.F.R. 90.631), and 220-222 MHz stations (47 C.F.R. 90.757) are permitted a twelve-month implementation period. See 47 C.F.R. 90.629, 90.665 and 90.685. Notice, 13 FCC Rcd at 21,138. See Day Catalano Comments at 4; AMTA Comments at 2; Motorola Comments 6; API Comments 5; UTC Comments at 3; Blooston Mordkofsky Comments at 3; APCO Comments at 3; LMCC Comments at 4. Motorola Comments at 6; API Comments at
- http://transition.fcc.gov/Bureaus/Wireless/Notices/1998/fcc98025.pdf http://transition.fcc.gov/Bureaus/Wireless/Notices/1998/fcc98025.txt http://transition.fcc.gov/Bureaus/Wireless/Notices/1998/fcc98025.wp
- I, non-nationwide licenses. Phase I non-nationwide licensees will be given an opportunity to seek modification of their license to relocate their initially authorized base station, i.e., locate their base station at a site other than its initially authorized location. The conditions under which modifications will be granted and the procedures for applying for license modifications are described in Sections 90.753, 90.757 and 1.927 of this chapter. For CMRS licensees, these modifications will be treated as minor modifications in accordance with Section 1.927 of this chapter. 74. Section 90.753 is amended by revising paragraphs (d) and (e) of this section to read as follows: Sec. 90.753 Conditions of license modification. * * * * * (d) The application for a Phase I
- http://wireless.fcc.gov/auctions/18/releases/220_e.pdf
- II nationwide licensees, does not apply to Phase I nationwide licensees.286 151. The discussion of the construction requirements in the 220 MHz Third Report and Order for nationwide 220 MHz services clearly deals with the construction requirements that will be imposed on Phase II nationwide licensees. In addition, the Commission added a heading to 287 the Commission's Rules following Section 90.757 which reads: "POLICIES GOVERNING THE LICENSING AND USE OF PHASE II EA , REGIONAL AND NATIONWIDE Federal Communications Commission FCC 98-93 Id. at 11125 (Appendix B); 47 C.F.R. 90.757. 288 Third Notice, 11 FCC Rcd at 206 (para. 30). 289 Id. 290 220 MHz Third Report and Order, 12 FCC Rcd at 10949, 11038 (paras. 6, 197). 291 Id.
- http://wireless.fcc.gov/auctions/18/releases/fc960027.pdf http://wireless.fcc.gov/auctions/18/releases/fc960027.txt http://wireless.fcc.gov/auctions/18/releases/fc960027.wp
- 24, 1991 (Phase I licensees) will be given an opportunity to seek modification of their license to relocate their initially authorized base station, i.e., locate their base station at a site other than its initially authorized location. The conditions under which modifications will be granted and the procedures for applying for license modifications are described in Sections 90.753, 90.755, and 90.757. For CMRS licensees, these modifications will be treated as minor modifications in accordance with Section 90.164. 4. Section 90.753 is added to Subpart T to read as follows: Appendix C -- Page 2 Section 90.753 Conditions of license modification. (a) Except as provided in paragraphs (b), and (c) of this section, a Phase I non-nationwide licensee may modify its authorization
- http://wireless.fcc.gov/auctions/18/releases/fc970057.pdf http://wireless.fcc.gov/auctions/18/releases/fc970057.txt http://wireless.fcc.gov/auctions/18/releases/fc970057.wp
- licenses. Phase I non-nationwide licensees will be given an opportunity to seek modification of their license to relocate their initially authorized base station, i.e., locate their base station at a site other than its initially authorized location. The conditions under which modifications will be granted and the procedures for applying for license modifications are described in Sections 90.753, 90.755, and 90.757. For CMRS licensees, these modifications will be treated as minor modifications in accordance with Section 90.164. 27. A new centered heading is added following Section 90.757 to read as follows: POLICIES GOVERNING THE LICENSING AND USE OF PHASE II EA, REGIONAL AND NATIONWIDE SYSTEMS. 28. A new Section 90.761 is added to read as follows: Section 90.761 EA and Regional
- http://wireless.fcc.gov/auctions/18/releases/fc980093.pdf http://wireless.fcc.gov/auctions/18/releases/fc980093.txt http://wireless.fcc.gov/auctions/18/releases/fc980093.wp
- too short a time to Federal Communications Commission FCC 98-93 285 220 MHz Third Report and Order, 12 FCC Rcd at 11017-19 (paras. 158-159). 286 Comtech Third Order Petition at 12; Global Third Order Petition at 9. 287 220 MHz Third Report and Order, 12 FCC Rcd at 11017-19 (paras. 158-159). 288 Id. at 11125 (Appendix B); 47 C.F.R. 90.757. 289 Third Notice, 11 FCC Rcd at 206 (para. 30). 290 Id. PAGE 66 significantly increase equipment development for the refarmed bands. Thus, we are not persuaded that conformance of the two standards would significantly promote the goals of either docket. We also note that nothing in the Refarming proceeding would preclude the use of 5 kHz equipment in refarmed
- http://wireless.fcc.gov/auctions/18/releases/fc980186.pdf http://wireless.fcc.gov/auctions/18/releases/fc980186.txt http://wireless.fcc.gov/auctions/18/releases/fc980186.wp
- C.F.R. 90.725(f) which originally required 88 non-nationwide Phase I licensees to construct within eight months of the initial license grant date. This construction deadline was extended several times until non-nationwide Phase I licensees must have constructed by March 11, 1996, or if they elected to relocate under the minor modification procedure, by August 15, 1996. See 47 C.F.R. 90.757(a). Phase I non-nationwide licensees with base stations authorized at a location north of Line A (near the Canadian 89 border) are required to construct their base stations, and place them in operation, within twelve months of the initial grant date, or within twelve months of the date of the release between of the terms of an agreement between the United
- http://wireless.fcc.gov/auctions/24/releases/pt1_pt90.pdf http://wireless.fcc.gov/auctions/24/releases/pt1_pt90.wp
- renewal expectancy. 90.745 Phase I licensee service areas. (a) A Phase I licensee's service area shall be defined by the predicted 38 dBu service contour of its authorized base station or fixed station transmitting on frequencies in the 220-221 MHz band at its initially authorized location or at the location authorized in accordance with 90.751, 90.753, 90.755 and 90.757 if the licensee has sought modification of its license to relocate its initially authorized base station. The Phase I licensee's predicted 38 dBu service contour is calculated using the F(50,50) field strength chart for Channels 7-13 in 73.699 (Fig. 10) of this chapter, with a 9 dB correction factor for antenna height differential, and is based on the authorized
- http://wireless.fcc.gov/licensing/index.htm?job=const_req_by_service
- 601 Main Form and Schedule K 220 MHz Phase I (Non-Nationwide Licenses) Construct and place into operation within 12 months of initial license grant date, or if modified under the Second Report and Order (FCC 96-27) on or before August 15, 1996, or if base station is located North of Line A, by January 21 2001. QD, QO, QT 90.725(f), 90.757(b) 601 Main Form and Schedule K 220 MHz Phase II (Nationwide Licenses) Provide coverage to a composite area of 750,000 sq. km or 37.5% of the US population within 5 years of initial license grant, and 1,500,000 sq. km or 75% of the population within 10 years of initial license grant. Alternatively, nationwide licensees may meet the construction requirements by
- http://wireless.fcc.gov/services/index.htm?job=operations_1&id=220mhz
- construction and place their systems into operation within 12 months of initial license grant in accordance with [30]Rule 90.725. Phase I non-nationwide licensees that modified their stations pursuant to [31]Rule 90.753 are required to construct their stations on or before August 15, 1996 or within 12 months of the initial grant date of their modification application in accordance with [32]Rule 90.757. Phase I Nationwide licensees are required to follow a schedule for construction and file benchmark reports at 2, 4, 6, and 10 years after initial license grant. The Construction requirements for Phase I Nationwide licenses are provided in [33]Rule 90.725. Phase II Construction Requirements Phase II economic area (EA) or regional area (REAG) licensees are required to provide coverage to
- http://www.fcc.gov/Bureaus/International/News_Releases/2000/nrin0002.doc
- 89-552, Implementation of Sections 3(n) and 332 of the Communications Act, Regulatory Treatment of Mobile Services, GN Docket No. 93-252, Implementation of Section 309(j) of the Communications Act - Competitive Bidding, 220-222 MHz, PP Docket No. 93-253, Second Memorandum Opinion and Order and Third Notice of Proposed Rulemaking, 11 FCC Rcd. 188, 284-85, 197-198 (1995). See 47 C.F.R. 90.757(b). Id. Id. News media Information 202 / 418-0500 TTY 202 / 418-2555 Fax-On-Demand 202 / 418-2830 Internet: http://www.fcc.gov ftp.fcc.gov Federal Communications Commission 445 12th Street, S.W. Washington, D. C. 20554 This is an unofficial announcement of Commission action. Release of the full text of a Commission order constitutes official action. See MCI v. FCC. 515 F 2d 385 (D.C. Circ
- http://www.fcc.gov/Bureaus/Wireless/Notices/1998/fcc98025.pdf http://www.fcc.gov/Bureaus/Wireless/Notices/1998/fcc98025.txt http://www.fcc.gov/Bureaus/Wireless/Notices/1998/fcc98025.wp
- I, non-nationwide licenses. Phase I non-nationwide licensees will be given an opportunity to seek modification of their license to relocate their initially authorized base station, i.e., locate their base station at a site other than its initially authorized location. The conditions under which modifications will be granted and the procedures for applying for license modifications are described in Sections 90.753, 90.757 and 1.927 of this chapter. For CMRS licensees, these modifications will be treated as minor modifications in accordance with Section 1.927 of this chapter. 74. Section 90.753 is amended by revising paragraphs (d) and (e) of this section to read as follows: Sec. 90.753 Conditions of license modification. * * * * * (d) The application for a Phase I
- http://www.fcc.gov/Bureaus/Wireless/Orders/2000/fcc00235.doc
- Blooston Mordkofsky Comments at 2; and UTC Comments at 3. See also PCIA Comments at 4-5. APCO Comments at 2. API Comments at 4. API Reply Comments at 4. 47 C.F.R. 90.135. For example, Location and Monitoring Service stations (47 C.F.R. 90.353), 800 MHz trunked radio systems (47 C.F.R. 90.631), and 220-222 MHz stations (47 C.F.R. 90.757) are permitted a twelve-month implementation period. See 47 C.F.R. 90.629, 90.665 and 90.685. Notice, 13 FCC Rcd at 21,138. See Day Catalano Comments at 4; AMTA Comments at 2; Motorola Comments 6; API Comments 5; UTC Comments at 3; Blooston Mordkofsky Comments at 3; APCO Comments at 3; LMCC Comments at 4. Motorola Comments at 6; API Comments at